治理河水英语
1. 必须有人阻止这家工厂污染河水(英语翻译) the factory __________the river
The factory must be prevented from polluting the river.
His father requires him to study hard and at the same time relax himself properly.
They would rather stay at home than go for a walk in order to get news from the Olympic stadium.
【公益慈善翻译团】真诚为您解答!
2. 英语翻译 河水受到了极其严重的污染以至于水里的鱼都死了.(so……that)
the river was polluted so seriously that all the fish in the water died.
3. 我们必须净化河水英语
我们必须保持空气清新,使苍鹰翱翔.
我们必须使海洋洁净,以便鲸鱼游泳.
我认为我们应当为守卫我们的水源和天空而战.
我们必须帮助我们的地球.
我相信我们必须努力!
4. 河水用英语怎么说
河水 [hé shuǐ]
基本翻译
[水文] river water
5. 河水变得很脏英语翻译
the water in the river becomes very dirty
6. 使河水变干净的英语翻译
To make the river clean
7. 怎样保护河水英语作文 中英对照
We can stop put rubbish into the sea……(此处省略100字)
8. 求有关河流治理工程A river cleaning project英语作文谈工程状况及看法急啊!
Abstract: With the high-grade highway construction the continuous development of road machinery demands more and more high, mechanical equipment are the efficient management and engineering decide the quality of the project a necessary condition for effectiveness, so strengthening the management of engineering machinery and equipment, so scientific management, rational use, timely maintenance, repair, as appropriate, economic accounting, in order to better highway engineering construction services, access to equipment management best value for money. In this paper, equipment management in highway engineering analysis, the existence problem for some of the views put forward their own. Keywords: road construction machinery and equipment cost-effective management of technical measures 1 Device Manager Problems Bidding system and project the Ministry of the system are under market economy conditions highway construction market development, proct, project subordinate non-permanent body, it was decided that the management of mechanical equipment, there are many questions. 1.1 Construction of equipment that does not support After the successful incorporation of the project engineering department, drawn from the project department of machinery and equipment are mostly poor technical condition, the injection of new highway projects, will inevitably affect the project progress and quality. And some major road works or special equipment not in place, equipment not supporting the same is a difficult problem. 1.2 Project Department of Equipment Management serious short-term behavior Projects pursued by the Department are the quality of the project, project progress and effectiveness. The use of machinery is of course the sooner the better, but because of the outside world by various factors, has to work overtime, work overload Long time, this "weight management, light use of" directly affect the mechanical behavior of the technical status and life. As for the failure of the course of construction machinery, especially large-scale machinery, project department are unwilling to bear the high cost of repair, but only by a project department also is not quite reasonable to assume. 1.3 Mechanical management and proction management contradictions exist Mainly road and bridge projects to technical staff, machinery managers often do not project or not project an important component of the Department staff and proction managers use as a machinery management layman, on the proper use of machinery, regular maintenance, such as knowledge may want to common sense, and the operator of the construction technology know very little about, often in a passive construction or dominance, so that management has been greatly weakened machinery. 2 device management measures 2.1 and actively made the organization of equipment Project set up the equipment should be immediately set up the project organization and management system, according to the size of the project organization plans to do a good job to determine the mechanical type, quantity and leading machinery, layout of all into the game plan and the total mechanical control, and timely reporting of organizations to plan, organize machinery in place and better understanding about the state of mechanical technology, to replace the inferior machinery, for highway projects successfully carried out to prepare. 2.2 to do a good job of checking all equipment, maintenance, debugging job (1) do a good job of preventive maintenance. The operation of all machinery arrived at the scene to conct a comprehensive start-up inspection, and manipulator of organizations to carry out routine maintenance of machinery and equipment, including three filter inspection, added grease, fastening bolts and check the oil level of pollution. For the existence of the mechanical problem should be the preparation of a reasonable repair plan and immediately implemented. (2) of newly purchased machinery to the selection of high quality and a strong sense of responsibility of personnel, coordinated the installation of equipment for the factory to do a good job debugging manipulator and the implementation of pre-job training, master rules, skilled technique before on machines work properly. 3 Construction Machinery Management (1) project department want detailed arrangements, good equipment, the work of the Organization, timely deployment of equipment. (2) The operator should be subordinated to the project arrangements, but also combined with the local situation, as appropriate, homework. (3) The operator must be strictly in accordance with the rules at any time to observe the dynamics of the situation of equipment, and remove any hidden dangers and put an end to such issues as a result of oil and water affect the normal operation. (4) The operator must be strictly enforced mechanical maintenance system in order to avoid outdated maintenance, so that mechanical work to maintain good status. On the utilization of high and easy to damage, failure of equipment easy to do a good job tracking the diagnosis should be changed after the repair to preventive repair. Mechanical anomaly happened to be immediately shutdown checks, and timely reporting to the leadership, organizational maintenance personnel to quickly repair site. (5) mechanical wearing parts should be ready reserves to avoid the cycle is too long to buy pieces of the impact of highway construction. (6) of the gap leasing machinery should be carried out to ensure that highway projects on schele. Machinery Leasing should do a good job in market research, efforts to rece leasing costs. 4 mechanical maintenance fund set up to strengthen the machinery and equipment costing (1) the establishment of mechanical repair funds, the implementation of earmarked projects can effectively resolve the Department's short-term behavior. Mechanical maintenance fund can be extracted from the project department, the ratio can be based on a project size or effectiveness of the case may be; (2) cost accounting to deal with fuel, lubricants and maintenance fees to implement a single registration at any time to complete units of equipment proction, power requirements, and other miscellaneous fittings consumption expenditure and so on. Record a sound use of mechanical equipment for operation of Units classes, Units, completion of proction, fuel, spare parts consumption prepare basic data collection, monthly summary and an analysis of the effects on the use of evaluation to the target machine to use technology to compare and adjust . 5 Concluding remarks Projects to strengthen the equipment of the optimal allocation of factors of proction, the use of management, cost accounting, on the one hand, can be coordinated, the organic combination of a common highway engineering projects achieve the expected goal. On the other hand can contribute to mechanical equipment and highway projects, the two common improve management effectiveness, this project is to strengthen the road construction equipment, effective management, the fundamental guarantee for improving economic efficiency and effective way.
9. 平缓清澈的河水怎么翻译成英语
sluggish and lucid current
10. 河流治理的英文表述方式是怎样的
river improvement; river control,rivers manageme